Skip to content
Resources

Resources & Calculators

Planning tools, free to use, no form required. Size a tent, size a dance floor, convert between feet and meters, and get a straight answer on what a project needs before anyone quotes it.

Questions the calculators do not answer get answered by a person at 480.663.3911.

Start with the tent calculator
Clear span structure erected on site
Towable generator on a night jobsite
Mobile restroom and shower suites
Permits
01 — Tent size calculator

How big a tent do I need?

Seating style
Add to the footprint
Units

2,960 sq ft

Covered area required

14.8 sq ft

Per guest, this layout

Sizes that cover it

30 ft x 100 ft (3,000 sq ft) 40 ft x 80 ft (3,200 sq ft) 50 ft x 60 ft (3,000 sq ft)

Clear span and frame structures come in fixed bay widths, so the practical answer is the next size up. Send us the guest count and we confirm against the site.

Tent sizing one-pager PDF — pending file

02 — Unit converters

Feet to meters, both directions.

Square feet to square meters

92.90 m²

Square meters to square feet

1,076 sq ft

Linear feet to meters

30.48 m

Meters to linear feet

98.4 ft

03 — Dance floor size

How much floor do the dancers need?

How much of the room dances

441 sq ft

Dance floor area

21 ft x 21 ft

Panel layout, 3 ft x 3 ft sections

Figured at 4.5 square feet per dancer. Floors are built from 3 ft by 3 ft panels, so the layout rounds to whole sections.

04 — Linen size calculator

Which linen fits the table?

Table
Drop

120 in round

Floor-length linen for 60 in round, seats 8

Linen specifications PDF — pending file

05 — Portable toilets planning tool

How many units, and how many are ADA?

Alcohol served

9

Standard units

1

ADA accessible units

3

Hand-wash stations

Sized against standard event ratios, with alcohol raising usage. Restroom suites and shower trailers change the math: we plan those with you.

06 — Power generator calculator

What size genset carries the site?

179 kW

Connected load, plus 25% headroom

200 kW

Recommended genset

A planning figure, not a design. Motor starting loads, redundancy and distribution runs change the answer; our power team sizes the final package and stages a backup unit where the show cannot go dark.

07 — Climate control calculator

How much cooling and heat does the structure need?

Conditions

27 tons

Cooling required

160k BTU

Heating required

Tents lose and gain heat far faster than buildings. Figures assume sidewalls closed and Arizona summer or winter design conditions; we confirm against the structure and the forecast.

08 — Arizona municipal special event licenses & permits

Municipal special event licenses and permits.

Every Arizona municipality runs its own special event process, and most require several approvals in parallel. Pride Group files these as part of pre-event planning: see Permitting for the City of Phoenix AFP process in detail.

Each name links to that jurisdiction's special event permitting page. City and county seals to be dropped into the circles.

Connect with us

Numbers checked. Now let us build it.

480.663.3911

Answered by a real person. Bring the calculator output and we confirm it against the site.